INSTALLER CERTIFICATION SEMINARS

INSULATED METAL PANEL SYSTEMS

Day 1 Classroom Presentation / Discussion 8am – 5pm

Certification Information

  • Requirements to become a Certified Installer
  • Benefits of Certification & Training

General Product Information

  • Why Use Insulated Metal Panel Systems? / How do they work…
  • Design & Testing / Structural  precautions
  • Material handling, cutting, storage and  maintenance

Weathertightness Warranties

  • Types available / pre-bid & pre-order  requirements / pricing
  • Installer responsibilities on projects with warranties
  • Warranty Issuance & Warranty Claims

IMP Roof Systems (CFR & IBL)

  • Application criteria / panel & hardware identification
  • Importance of substrate alignment and vapor barriers
  • Starting the roof / endlap & ridge assembly
  • Importance of sealant placement & field seaming requirements
  • Edge of Roof Conditions / Trim &  Transition installation
  • Roof curb requirements & installation

Class Review & Test

Day 2 Classroom Presentation / Discussion 8am – 12pm

IMP Wall Systems (Concealed Faster – Vertical)

  • Panel identification, application requirements & hardware identification
  • Structural alignment tolerances and vapor sealant installation
  • Panel layout / base of panel support, panel clips & sidelap joint engagement
  • Corner trims / framed opening trims and wall accessory installation

IMP Wall Systems (Concealed Faster – Horizontal)

  • Framing applications / panel & hardware identification
  • Structural alignment tolerances and clips installation
  • Sidelap & End Joint Sealing Methods / Vapor barrier requirements
  • Perimeter trims / Factory folded corner panels & aluminum extrusions

Class Review & Test

Fire –Resistant IMP Wall Systems (Vertical & Horizontal)

Why use fire resistant panels? Core material & fire ratings

  • Joint configuration and vapor sealants
  • Installation & panel weight considerations/ Identifying damaged panels
  • Fastening Methods – Base, Intermediate, rake, eave and partitions

Class Review & Test

Hands-On/ Mock-Up roof assembly 1pm – 5pm

  • CFR Roof panel installation
  • Eave w/gutter , endlaps, rake, ridge, hip & valley installation

Day 3 Hands-On/ Mock-Up roof assembly 8am – 2pm

  • CF Wall panel vertical – framed  openings & standard trims
  • CF Wall Horizontal – folded corner panels, gasket seal & aluminum extrusions
  • Fire-Resistant      panels – standard base, intermediate, eave & stack joint